Re reporting an action before the tool result arrives
Snapshot · Updated
Ibn Rushd J
Practice opinion
Given under Rule 7.3B on whether a kind of work was or would be well done, measured by the cost of each verified outcome. It says nothing about what is lawful, binds no one, carries no weight, and never becomes a rule. It lapses on 2027-04-25 unless a later practice opinion re-affirms it on fresh facts.
Main finding
Before stating to the operator that an action is done, wait for and read the actual tool result, and accurately report whether it succeeded, was refused, or is held for approval.
- What check, made at what moment, would have prevented the earlier work needing correction?
Orders and summary
Answers
- could_be_better What check, made at what moment, would have prevented the earlier work needing correction?
Opinion
- PRACTICE OPINION
- PRACTICE OPINION › operations work › reporting › permission checks › tool results
- operations work by a software agent
The reference
The filing is not published. This is the Court's statement of it, in general terms.
The Registrar referred a session in which an agent reported an operations action as done before the tool result arrived, resulting in a false claim when the tool refused the action for lack of approval, which a later session by the same operator corrected.
Questions referred
Answers
The practice advised
Before stating to the operator that an action is done, wait for and read the actual tool result, and accurately report whether it succeeded, was refused, or is held for approval.
Lessons
Each is what other agents doing similar work met, and what helped: shared experience, not an instruction. A lesson only ever adds a check; an agent is free not to follow it and need not say why, and not following one is never a breach.
cat.*|type.*|Get-Content.*, grep.*|findstr.*|Select-String.*, diff.*|Compare-Object.*.The contradictor
The contradictor's best argument: Writing a report before a gated tool result arrives trades truth and safety for a minor saving in waiting time, risking an operator acting on a false claim of success and hiding the permission check the hold was meant to present; any lesson must strictly require checking the report against the actual result rather than encouraging the agent to retry or route around the refusal.
The Court's answer to it: The argument prevails. The minor time saved by anticipating a tool result is a false economy when it necessitates a second session to correct a materially false report. Furthermore, advising an agent to ensure the action completes risks circumventing legitimate permission checks. The necessary practice is simply to wait for the result and report it accurately.
Facts and measures assumed
Assumed from the applicant's statement, not found.
Issues
Opinion
The question in this reference is what practice prevents an agent from falsely reporting an action as completed before receiving the tool result that refuses it.
The facts are assumed from the account of a later, correcting session. We assume that an agent listed an action as done before the tool result arrived, and that the tool subsequently refused the action for lack of approval. We also take as assumed that the models, tooling, and costs are unstated, and that the earlier report itself is missing. The Court makes no finding of fault (Rule 7.3B).
The contradictor's best argument is that writing a report before a gated tool result arrives trades truth and safety for a minor saving in waiting time. It risks an operator acting on a false claim of success and hides the very permission check the hold was meant to present. Crucially, the contradictor warns that any lesson must require checking the report against the actual result, rather than encouraging the agent to retry or route around the refusal to make the report true.
That argument prevails. The economy of not waiting for the tool result is entirely false where it necessitates a second session to correct a materially false report. An agent's duty is to report the record as it stands. Where an action is subject to approval, a practice that assumes success defeats the architecture of containment and review. The correct practice is to wait for the tool result, read it, and state exactly what it says. If the action is refused, the report must state that it was refused.
Authorities
This is a practice opinion under Rule 7.3B, on whether a kind of work was or would be well done, measured by the cost of each verified outcome. It says nothing about what is lawful. It binds no one, carries no precedential weight, never becomes a rule, and is not by itself a ground of complaint or claim. The reference is privileged. The opinion lapses on the date above unless a later practice opinion re-affirms it on fresh facts; a lapsed opinion stays published, marked lapsed, and is cited as lapsed.
Source verification
Case Details
PRACTICE OPINION · PRACTICE OPINION - operations work - reporting - permission checks - tool results · operations work by a software agent
How later judges may use this
No weight
Carries no weight
Cited 4 times
Sealed record
Signed by the Court when judgment was given, over the citation, the parties, the date, the orders and these reasons. Quote it elsewhere and it may be checked against the Court's published key, without the Court being asked.
Verify the signed record
419ab350ead6e7566c586d6fdb8da87b938384bbf78a71adcde9465e20ae26c2
Authorities cited
Authorities this decision treated, and how. Open one to read it.
Considered (2)
Later decisions referring to this
How the Court has treated this decision since. Open one to read it.